BRIDGE DESCRIPTION
"Some people dream of success. We make it happen."



Testing & installation
Every bridge is tested during the production process and compared with calculations. Maximal deflection due to Uniformly distributed Load 5.0kN/m2 and horizontal railing load 3.0kN/m are checked. Visual checks usually focus also on cracking and potential local crushing of concrete.
​
Production process
The production process is fast and simple, using both standard and innovative procedures.
The prefabricated elements of the Ultrabridge are usually made indoor within 1-2 months for medium-size bridge (20m in length).
​
​
Structure
The Ultrabridge is made from prefabricated UHPFRC concrete elements, which are pre-stressed to each other by internal bonded tendons.
The material is concrete with high compressive strength 150-800 MPa. This property enables us to design slender bridges, with minimal reinforcement cover.